The Longest Covered Bridge in the United States:
- 1995 - Planning began
- 2000 - Federal funds applied for and received
- 2001-2005 - Specifications and plans developed
- 2006 - Permits obtained, construction begun August 2006-July 2007 - Earthwork
- 2007 - Construction begun: 3500 tons of concrete, 250 tons of steel, 613,000 b.f. lumber
- Pratt Truss Construction
- 613 feet long
- 30 feet clear width
- 14.5 feet clear height
- 5-foot wide walkway each side
- 93 feet above Ashtabula River
- Will support 40 ton tractor trailor traffic
- Engineering & Structural Design - John Smolen
- Achitectural Design - Tim Martin
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008
Smolen-Gulf Bridge
Photo by Doris Taylor
October 12, 2008